Projects : Projects implementation

   
image

The reality of our forecasts is confirmed by the fact that now one of the most popular serial composite docks lifting capacity 8500 t is built at our plant for one of the countries of Persian Gulf and also the dock with lifting capacity 20000 t for Bulgaria. At the same time we negotiate with other customers about building of other six docks with lifting capacity1500 t up to 16000 t.

image

The luxury floating hotel for 428 passenger places was built by our plant. This hotel was delivered to the place of its location in the city of Kyiv. We have already received the request from Russian Federation about the building such hotels for the city of Sochi in connection with a preparation to the Olympic Games 2012.

image

The serial production of different purpose pontoons for the provision of necessary facilities on the Black Sea coast of Turkey continues at the plant, including a floating hospital and a floating island for aseismic stable areas. Kherson State Plant «Pallada» has good prospects for the efficient further trading. Today we can speak about several, actually equivalent lines of the plant development; each of them is able to ensure success and economic stability of our plant.

But it should be noted that the main asset of Kherson State Plant «Pallada» is the unique combination of well-tried during long time : technologies, workmanship and fine reputation.

Preserving this trinity, Kherson State Plant «Pallada» has all chances to stay the absolute leader in its segment of the production activity at the world market.

Photo

   
photo
photo
photo
photo